At first page Next page

Colville River Begins flowing over landfill at 53.5 ft stage (75,000 cfs) (USGS Rating 3)

Significant flow into landfill begins at 56 ft stage (120,000 cfs)(55.75ft stage photo) (viewUS from road)

Swale flow photos (entrance - at road)

2011 Period of Flow over landfill: May 26 - June 3 (other peak flows)

Maximum water depth approx. 5 ft over landfill with velocities up to 7 -8 fps in channel

see velocity plot along road to river (pdf) (route) (notes)

2011 aerial photos (5/28) (5/30A) (5/30B)

 

colville_20040830pipe
colville_20080711pipe
colville20060604wirerope
colvilleLB20060912_drums
colvilleLB20060912_drums1
landfill_20050608
landfill_20060528
landfill_20060528a
landfill_20090505
landfill_20100609
landfill_20100609drums
landfill_20100609tracks
landfill_20100610bitsinsidedrum
landfill_crushed_drums20110602
landfill_drums20110602
landfill_MW25_20040615
landfill_newerosion_20110602
landfill_newerosion1_20110602
landfill_newerosion2_20110602
landfill_newerosionB20110602
landfill_smalltransformer20110602
landfill_trackedvehicle20110602
landfill1_20110602
landfill2cycle_engine20110602

jAlbum 9